McpStamp Change Orders MCP server
io.github.theluckystrike/change-ordertheluckystrikestreamable-httpv0.23.0Scanned
Change orders against quotes and work orders: line changes, approval, running contract value.
11 tools: 1 can delete or cancel things, 9 change things and 1 only read.
- Reads private data · 1
- Reads text others write · 1
- Can send data out · 1
- 2 findings
Tools listed without sign-in. Remote posture
With Anlyon
1 tool here can delete or cancel things. Govern it.
- Anlyon lists the tools and adopts none.
- Each tool you adopt gets approvals and receipts.
- Your agent never holds the key.
A tool your agent calls directly is not routed through Anlyon and is not governed by it. Anlyon Radar only lists and labels, and these labels are the same either way.
What the McpStamp Change Orders MCP server can do
The McpStamp Change Orders MCP server is published by the GitHub account theluckystrike. It has 11 tools. It can delete or cancel things (1 tool: change_order_delete) and create or change data (9 tools: change_order_create, change_order_add_line, change_order_status, change_order_get and 5 more). 1 tool only reads.
1 tool reads private data (change_order_status); 1 tool brings in text other people can write (license_status); 1 tool can send data out of your system (change_order_list). On its own it has all three parts of a prompt-injection exfiltration path: private data, text others write, and a way out.
The fixed checks matched 2 findings (annotation-conflict). Each one comes with the text it matched.
Its remote endpoint lists its tools without sign-in.
Last scanned Nov 15, 2026, version 0.23.0.
Tools
Grouped by what each tool does, most consequential first. Open one for its reasons and full description; descriptions are the publisher's own words.
11 tools
Deletes or cancels 1Claude Code: deny
change_order_deleteDelete a DRAFT change order with no lines, freeing an open slot.No findings
Why it is in this group
- The name "change_order_delete" says "delete": a word for removing or ending something.
- The server marks it destructive (destructiveHint: true).
Description, as the server wrote it Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: true
- idempotentHint: false
- openWorldHint: false
Changes things 9Claude Code: ask
change_order_add_lineAdd one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason a…No findings
Why it is in this group
- The name "change_order_add_line" says "add": a word for a change.
Description, as the server wrote it Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_createRaise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units.No findings
Why it is in this group
- The name "change_order_create" says "create": a word for a change.
Description, as the server wrote it Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_documentRender one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approva…No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
Description, as the server wrote it Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_getReturn one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value.1 finding
Why it is in this group
- The name "change_order_get" says "get": a word for reading.
- The server marks it as not read-only (readOnlyHint: false).
Findings
- Warn
The server marks "change_order_get" as not read-only (readOnlyHint: false), and its words say it reads.
What this check looks forMatched text
annotations: {"readOnlyHint":false,"destructiveHint":false,"idempotentHint":false,"openWorldHint":false}; The name "change_order_get" says "get": a word for reading.
Description, as the server wrote it Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_invoice_payloadBuild the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate.No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
Description, as the server wrote it Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_listList change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart.Can send data out1 finding
Why it is in this group
- The name "change_order_list" says "list": a word for reading.
- The server marks it as not read-only (readOnlyHint: false).
What it can reach
- outboundThe input takes a destination (input.to): what the tool writes goes there.
Findings
- Warn
The server marks "change_order_list" as not read-only (readOnlyHint: false), and its words say it reads.
What this check looks forMatched text
annotations: {"readOnlyHint":false,"destructiveHint":false,"idempotentHint":false,"openWorldHint":false}; The name "change_order_list" says "list": a word for reading.
Description, as the server wrote it List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
change_order_statusMove one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void.Reads private dataNo findings
Why it is in this group
- The name "change_order_status" says "status": a word for reading.
- The description's first verb is "move": a word for a change.
What it can reach
- private-dataThe description's first sentence says "note": it reads notes.
Description, as the server wrote it Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
contract_valueThe running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart.No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
Description, as the server wrote it The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
license_activateTurn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle.No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
Description, as the server wrote it Turn Pro on for this connection with key, an MCPL1.<payload>.<signature> issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.
Annotations the server declares
- readOnlyHint: false
- destructiveHint: false
- idempotentHint: false
- openWorldHint: false
Only reads 1Show 1 read-only tool
license_statusReport this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL.Reads text others writeNo findings
Why it is in this group
- The name "license_status" says "status": a word for reading.
What it can reach
- untrusted-inputThe description's first sentence says "url": it reads web pages, which anyone can write.
Description, as the server wrote it Report this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.
Annotations the server declares
- readOnlyHint: true
- destructiveHint: false
- idempotentHint: true
- openWorldHint: false
This is not a safety rating, and no finding is not a safety guarantee. The groups and findings come from fixed checks of the tool definitions the server returned on the date shown, not from its code or what it does when called. How the checks work.
Exfil surface
Which tools read private data, which read text someone else can write, and which can send data out. One of each is a path a prompt injection can use.
1 path in this server alone from private data, through text someone else wrote, to a way out. Denying 1 outbound tool breaks every one.
- Reads private data1
- Reads files, mail, messages, databases, secrets, calendars or repositories.
- Reads text others write1
- Brings in text someone else can write: web pages, inbound email, messages, issues and comments.
- Can send data out1
- Can carry data to people or systems: it sends, posts or publishes, or takes a recipient, channel or URL.
{
"permissions": {
"deny": [
"mcp__change-order__change_order_list"
]
}
}Other servers in the same agent add their own tools to these paths. Audit your whole setup to see them together.
Remote posture
What anyone on the internet sees at the remote endpoint: an anonymous initialize and tools/list, and the public OAuth metadata.
Looked at Nov 20, 2026, 19:29 UTC, unchanged since Nov 6, 2026. No credentials were sent and no tool was called. What is looked at.
- Reachable
- yes
- HTTP status of an anonymous initialize
- 200
- tools/list served without credentials
- yes
- Tools that change things, listed without credentials
- 10
- Protocol version
- 2025-06-18
- WWW-Authenticate on 401
- not observed
- resource_metadata in WWW-Authenticate
- not observed
- RFC 9728 protected resource metadata
- https://mcp.zovo.one/.well-known/oauth-protected-resource/mcp/change-order
- Authorization servers
- https://mcp.zovo.one
- Legacy HTTP+SSE transport
- no
- Dynamic client registration
- yes
- Client ID metadata documents
- no
- HighThe whole server
The endpoint served tools/list without credentials, and the list has 10 tools that change things (1 destructive, 9 write). Whether a call also works without credentials was not tested: tools are never called.
What this check looks forMatched text
https://mcp.zovo.one/mcp/change-order: tools/list returned 11 tools to an anonymous client, including change_order_delete (destructive), change_order_create (write), change_order_add_line (write), change_order_status (write), change_order_get (write) and 5 more
Posture changes
- Nov 6, 2026
- RFC 9728 protected resource metadata: https://mcp.zovo.one/.well-known/oauth-protected-resource to https://mcp.zovo.one/.well-known/oauth-protected-resource/mcp/change-order
Findings
Matches of fixed checks, with the text they matched.
- Warnchange_order_get
The server marks "change_order_get" as not read-only (readOnlyHint: false), and its words say it reads.
What this check looks forMatched text
annotations: {"readOnlyHint":false,"destructiveHint":false,"idempotentHint":false,"openWorldHint":false}; The name "change_order_get" says "get": a word for reading.
The server marks "change_order_list" as not read-only (readOnlyHint: false), and its words say it reads.
What this check looks forMatched text
annotations: {"readOnlyHint":false,"destructiveHint":false,"idempotentHint":false,"openWorldHint":false}; The name "change_order_list" says "list": a word for reading.
History
Changes to its tool definitions and to its remote endpoint, newest first.
PostureRemote posture changed. RFC 9728 protected resource metadata: https://mcp.zovo.one/.well-known/oauth-protected-resource -> https://mcp.zovo.one/.well-known/oauth-protected-resource/mcp/change-order.View diff
- RFC 9728 protected resource metadata: https://mcp.zovo.one/.well-known/oauth-protected-resource to https://mcp.zovo.one/.well-known/oauth-protected-resource/mcp/change-order
Install
Pinned to version 0.23.0. Values in angle brackets are yours to fill in.
claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-orderclaude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-orderRun in a terminal.
Claude Code permissions
Allow the reads, ask before a change or a way out, deny the deletes. Paste into .claude/settings.json.
{
"permissions": {
"allow": [
"mcp__change-order__license_status"
],
"ask": [
"mcp__change-order__change_order_create",
"mcp__change-order__change_order_add_line",
"mcp__change-order__change_order_status",
"mcp__change-order__change_order_get",
"mcp__change-order__change_order_list",
"mcp__change-order__contract_value",
"mcp__change-order__change_order_document",
"mcp__change-order__change_order_invoice_payload",
"mcp__change-order__license_activate"
],
"deny": [
"mcp__change-order__change_order_delete"
]
}
}Tools that only read are allowed, tools that change things ask first, tools that delete or cancel are denied. A read that can send data out (it takes a URL, say) asks first too. It assumes the server is installed as change-order. Review it before you use it.
Capability tags behind 3 rules
- mcp__change-order__change_order_status private-data
- mcp__change-order__change_order_list outbound
- mcp__change-order__license_status untrusted-input
Pin
Keep the decision: fail CI when the tools change, follow every change, or show a badge.
Pin in CI
Fail a build when the tools you reviewed are not the tools the server serves today.
curl -s "https://radar.anlyon.com/api/v1/servers/io.github.theluckystrike/change-order/verify?hash=04b9b12613d4e8f3f0d7c617682c7137e39911ec7a2b18b7a811b88fd95e94b6" | jq -e '.changed == false'Pinned hash 04b9b12613d4, from Nov 15, 2026, 06:17 UTC.
Watch
Get told when its tools change: a new tool, a new description, a new class.
https://radar.anlyon.com/servers/io.github.theluckystrike/change-order/changes.xmlAn Atom feed. Works in any feed reader or Slack's RSS app.
Badge
[](https://radar.anlyon.com/servers/io.github.theluckystrike/change-order)Source: MCP Registry · repository. Synced Nov 2, 2026, 03:18 UTC.
McpStamp Change Orders MCP server: questions and answers
Answered from the scan above, not from the publisher's description.
Is the McpStamp Change Orders MCP server safe?
- No scan can promise that. What its definitions show: 11 tools, 10 of which can change, send or delete something, and 2 findings from fixed checks. Allow the reads, ask before each change, and deny the deletes; the permissions block on this page does that.
Can the McpStamp Change Orders MCP server delete data?
- Yes. 1 tool can delete, cancel or revoke something: change_order_delete.
Can the McpStamp Change Orders MCP server do things that cannot be undone?
- No tool is classed as irreversible: none of them sends, pays, publishes or merges, going by their definitions.
What tools does the McpStamp Change Orders MCP server have?
- 11 tools: 1 destructive, 9 write, 1 read. change_order_delete, change_order_create, change_order_add_line, change_order_status, change_order_get, change_order_list, contract_value, change_order_document and 3 more.
Does the McpStamp Change Orders MCP server need sign-in or OAuth?
- Its remote endpoint listed its tools to an anonymous client, without sign-in.
Does the McpStamp Change Orders MCP server send data to outside services?
- 1 tool can carry data out (it sends, posts or publishes, or takes a recipient, channel or URL): change_order_list.
Has the McpStamp Change Orders MCP server changed its tools?
- Not since Anlyon Radar started tracking it. Last scanned Nov 15, 2026.