TransitRadar — UK trains and buses MCP server
uk.co.transitradar/transitradartransitradar.co.ukstreamable-httpv1.5.0Scanned
Live UK rail boards, journey planning, train history, units, lifts, disruptions, punctuality.
16 tools: 4 do something that can't be undone, 8 change things and 4 only read.
- Reads private data · 0
- Reads text others write · 0
- Can send data out · 4
- 4 findings
Tools listed without sign-in. Remote posture
With Anlyon
4 tools here do something that can't be undone. Govern them.
- Anlyon lists the tools and adopts none.
- Each tool you adopt gets approvals and receipts.
- Your agent never holds the key.
A tool your agent calls directly is not routed through Anlyon and is not governed by it. Anlyon Radar only lists and labels, and these labels are the same either way.
What the TransitRadar — UK trains and buses MCP server can do
The TransitRadar — UK trains and buses MCP server is published by transitradar.co.uk, a domain the MCP Registry verified. It has 16 tools. It can do things that cannot be undone, such as sending, paying or publishing (plan_journey, bus_stop_departures, station_departures and plan_door_to_door) and create or change data (8 tools: bus_performance, late_trains, disruptions, train_history and 4 more), but cannot delete data. 4 tools only read.
4 tools can send data out of your system (plan_journey, bus_stop_departures, station_departures and 1 more).
The fixed checks matched 4 findings (annotation-conflict). Each one comes with the text it matched.
Its remote endpoint lists its tools without sign-in, and its tools changed 2 times since Anlyon Radar first saw them.
Last scanned Nov 21, 2026, version 1.5.0.
Tools
Grouped by what each tool does, most consequential first. Open one for its reasons and full description; descriptions are the publisher's own words.
16 tools
Can't be undone 4Claude Code: ask
bus_stop_departuresNext buses from a bus stop anywhere in Great Britain.Can send data out1 finding
Why it is in this group
- The name "bus_stop_departures" says "stop": a word for a change.
- The input addresses people (input.to): what it sends cannot be taken back.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
What it can reach
- outboundThe input takes a destination (input.to): what the tool writes goes there.
Findings
- Warn
The server marks "bus_stop_departures" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The name "bus_stop_departures" says "stop": a word for a change.
Description, as the server wrote it Next buses from a bus stop anywhere in Great Britain. Takes a stop name with its town or area; many stops share a name across the country, so 'Trafalgar Square' alone can land in Greater Manchester while 'Trafalgar Square London' finds Charing Cross. A stop letter can follow, e.g. 'Trafalgar Square London stop X'. A stop's ATCO/NaPTAN code also works. Live predictions in London (TfL); elsewhere the timetable, so a 'scheduled' time is not a live estimate. With 'to', only buses that go on to that stop are listed, each with its scheduled time there: the answer to 'next bus from Trafalgar Square to Brixton Station'. Those boards always come from the timetable, with the live bus and its delay where it can be identified. Other matching stops are returned alongside.
Annotations the server declares
- title: Next buses from a stop
- destructiveHint: false
- readOnlyHint: true
plan_door_to_doorPlan a GB journey that may combine trains, buses and short walks, between railway stations, bus stops or coordinates, from the timetables.Can send data out1 finding
Why it is in this group
- The input addresses people (input.to): what it sends cannot be taken back.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
What it can reach
- outboundThe input takes a destination (input.to): what the tool writes goes there.
Findings
- Warn
The server marks "plan_door_to_door" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
Description, as the server wrote it Plan a GB journey that may combine trains, buses and short walks, between railway stations, bus stops or coordinates, from the timetables. Each place can be a station name or CRS code, a bus stop with its town (e.g. 'Briggate Leeds'), a stop code, or 'lat,lon'. Returns the next few ways after a time with every leg: mode, line or train, where to board and alight, and times. Timetabled, not live. For rail only, plan_journey is simpler.
Annotations the server declares
- title: Plan a journey by train and bus
- destructiveHint: false
- readOnlyHint: true
plan_journeyPlan a GB rail journey between two stations from the timetable, including changes: the next few ways to get there after a time, each with departure, arrival, number of changes and …Can send data out1 finding
Why it is in this group
- The input addresses people (input.to): what it sends cannot be taken back.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
What it can reach
- outboundThe input takes a destination (input.to): what the tool writes goes there.
Findings
- Warn
The server marks "plan_journey" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
Description, as the server wrote it Plan a GB rail journey between two stations from the timetable, including changes: the next few ways to get there after a time, each with departure, arrival, number of changes and every train to catch with where to board and alight. 'via' forces the route through up to 3 stations in order ('Darwen to Penrith via Bolton'), staying aboard where one train does it. This is the timetable, not live running; for live times on a direct train use station_departures with 'to', and for one train's progress use get_train with its planning ID.
Annotations the server declares
- title: Plan a rail journey
- destructiveHint: false
- readOnlyHint: true
station_departuresLive departure or arrival board for a GB railway station, from National Rail's Darwin feed: booked time, expected time, actual time once reported, platform, operator and any delay …Can send data out1 finding
Why it is in this group
- The input addresses people (input.to): what it sends cannot be taken back.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
What it can reach
- outboundThe input takes a destination (input.to): what the tool writes goes there.
Findings
- Warn
The server marks "station_departures" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
Description, as the server wrote it Live departure or arrival board for a GB railway station, from National Rail's Darwin feed: booked time, expected time, actual time once reported, platform, operator and any delay or cancellation reason. With 'to', only trains that also call at that station are listed, each with its booked, expected and actual time there: the live answer to 'next train from Bolton to Darwen'. On an arrivals board, 'to' is where the train came from. An expected time equal to the booked one means no revision has been published, which usually means running to plan. A missing expected time is not a statement that the train is on time. Reasons are National Rail's own wording.
Annotations the server declares
- title: Live departures or arrivals
- destructiveHint: false
- readOnlyHint: true
Changes things 8Claude Code: ask
bus_disruptionsCurrent and planned bus disruptions in Great Britain from the Bus Open Data Service (SIRI-SX): diversions, closed stops, roadworks and events, each with the operators and lines aff…No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it Current and planned bus disruptions in Great Britain from the Bus Open Data Service (SIRI-SX): diversions, closed stops, roadworks and events, each with the operators and lines affected and the stops named. Filter by operator code (NOC) or by a word matched against the text, e.g. a town, road or line. Rail incidents are the separate 'disruptions' tool.
Annotations the server declares
- title: Bus disruptions
- destructiveHint: false
- readOnlyHint: true
bus_performanceToday's bus punctuality estimate for Great Britain, nationally and by operator: journeys counted, the share on time, early and late, and the average delay.No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it Today's bus punctuality estimate for Great Britain, nationally and by operator: journeys counted, the share on time, early and late, and the average delay. Each bus journey is counted once, judged on arrival near its last stop, and only in the roughly 25 urban areas we sample, so it is an ESTIMATE of how buses are running, not an official figure. 'On time' follows the GB bus standard: up to 1 minute early or 5 minutes 59 late; running early counts against it.
Annotations the server declares
- title: How buses are running today
- destructiveHint: false
- readOnlyHint: true
daily_performanceTransitRadar's own record of one completed day on GB passenger rail: how many trains ran, how many were cancelled, the share of recorded arrivals within five minutes at their desti…No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it TransitRadar's own record of one completed day on GB passenger rail: how many trains ran, how many were cancelled, the share of recorded arrivals within five minutes at their destination, the same share counting each cancellation as a failure, per-operator figures, and the commonest delay and cancellation reasons. Measured at the destination, so it is stricter than, and not comparable with, the industry's published PPM. Available from 2026-08-06 up to yesterday; where fewer than half of arrivals were recorded, no punctuality figure is given.
Annotations the server declares
- title: How the railway did on a day
- destructiveHint: false
- idempotentHint: true
- readOnlyHint: true
direct_destinationsEvery station reachable from a GB railway station WITHOUT CHANGING TRAINS on a date, after a time, each with the train that gets there soonest (a later but faster train beats an ea…No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it Every station reachable from a GB railway station WITHOUT CHANGING TRAINS on a date, after a time, each with the train that gets there soonest (a later but faster train beats an earlier slow one), sorted by arrival. Includes places reached by staying aboard a train that divides or joins another en route: those rows carry an 'association' naming where, and the passenger must be in the right portion. Timetabled times, not live. Use plan_journey when a change of train is acceptable or a destination is already known.
Annotations the server declares
- title: Where can I go without changing
- destructiveHint: false
- readOnlyHint: true
disruptionsCurrent GB rail incidents and planned engineering work from National Rail's KnowledgeBase: what is affected, the operators, the dates and a link to National Rail's notice.No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it Current GB rail incidents and planned engineering work from National Rail's KnowledgeBase: what is affected, the operators, the dates and a link to National Rail's notice. Optionally filter by operator (name or two-letter code) or by any text, such as a station, line or reason.
Annotations the server declares
- title: Rail disruptions
- destructiveHint: false
- readOnlyHint: true
late_trainsGB passenger trains running late right now, and trains booked to be running now that are cancelled (wholly or part of the way).No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it GB passenger trains running late right now, and trains booked to be running now that are cancelled (wholly or part of the way). Each train has its route, how late it is, where it last reported, where it calls next, the reason Darwin gives, and a Delay Repay link once a claim is worth making. Optionally filter by operator (name or two-letter code) or set the lateness threshold.
Annotations the server declares
- title: Trains late or cancelled now
- destructiveHint: false
- readOnlyHint: true
station_infoDetails of a GB railway station: address, managing operator, facilities, step-free access, industry codes (CRS, TIPLOC, STANOX, NLC) and, where Network Rail publishes it, the live …No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it Details of a GB railway station: address, managing operator, facilities, step-free access, industry codes (CRS, TIPLOC, STANOX, NLC) and, where Network Rail publishes it, the live status of each public lift. Lift status is 'In service', 'Out of service' or 'Data not available'; the last means the status is not known, and Network Rail's wording for it advises checking before travel. A station with no lifts listed is not necessarily a station without lifts; it may not report live status yet.
Annotations the server declares
- title: Station details and lift status
- destructiveHint: false
- readOnlyHint: true
train_historyHow one timetabled train has actually run over recent days, by its planning ID (from find_train, station_departures or get_train): each day's delay at its final destination, cancel…No findings
Why it is in this group
- Nothing in its name or description says what it does, so it is counted as a write.
- The server marks it read-only (readOnlyHint: true), but an annotation never lowers a class.
Description, as the server wrote it How one timetabled train has actually run over recent days, by its planning ID (from find_train, station_departures or get_train): each day's delay at its final destination, cancellations and any reason given, plus the share on time. Delay is measured where the train ends, not at any station along the way. History follows the planning ID, which changes when the timetable changes, so a newly timetabled train has little history; days the train did not run are simply absent.
Annotations the server declares
- title: How a train has run recently
- destructiveHint: false
- idempotentHint: true
- readOnlyHint: true
Only reads 4Show 4 read-only tools
find_trainSearch the GB rail timetable for specific trains.No findings
Why it is in this group
- The name "find_train" says "find": a word for reading.
Description, as the server wrote it Search the GB rail timetable for specific trains. The query combines terms: an operator and a headcode ('LNER 1S09', 'EMR 1H26'), a time and a station ('12:19 from Corby' — matched within about ten minutes either side), two stations ('Corby to St Pancras', which also finds trains calling at both), or a planning ID / UID ('C12345', or its first few characters). A headcode alone is not unique: the same four characters run in several parts of the country at once, so results for one headcode can be different trains, told apart by origin and destination. Returns planning IDs to pass to get_train.
Annotations the server declares
- title: Find a train
- destructiveHint: false
- readOnlyHint: true
find_unitLook up a GB passenger train unit or carriage by the five- or six-digit number painted on it (e.g.No findings
Why it is in this group
- The name "find_unit" says "find": a word for reading.
Description, as the server wrote it Look up a GB passenger train unit or carriage by the five- or six-digit number painted on it (e.g. '360107'): which service it is working now, the other services it is booked to work today, and the last calling point it was reported at. This comes from the operator's rolling-stock allocation, which is a plan and may be wrong during disruption. The position is the last calling point reported, not a live GPS fix — the train is somewhere beyond it.
Annotations the server declares
- title: Where is a train unit
- destructiveHint: false
- readOnlyHint: true
get_trainFull details of one train by its planning ID (UID, e.g.No findings
Why it is in this group
- The name "get_train" says "get": a word for reading.
Description, as the server wrote it Full details of one train by its planning ID (UID, e.g. 'C04207'): every public calling point with booked, expected and actual times, platforms and per-stop cancellations, plus — for today's trains — where it was last reported and how late. A cancellation can apply to only some stops. 'lastReport' is the last place signalling or movement data placed the train, not a GPS position. Reasons are National Rail's own words.
Annotations the server declares
- title: Train details and live running
- destructiveHint: false
- readOnlyHint: true
search_stationsFind GB railway stations by name or code.No findings
Why it is in this group
- The name "search_stations" says "search": a word for reading.
Description, as the server wrote it Find GB railway stations by name or code. Returns each station's three-letter CRS code (e.g. KGX), its TIPLOC and whether it has step-free access. The CRS code is what the other station tools accept.
Annotations the server declares
- title: Search stations
- destructiveHint: false
- idempotentHint: true
- readOnlyHint: true
This is not a safety rating, and no finding is not a safety guarantee. The groups and findings come from fixed checks of the tool definitions the server returned on the date shown, not from its code or what it does when called. How the checks work.
Exfil surface
Which tools read private data, which read text someone else can write, and which can send data out. One of each is a path a prompt injection can use.
No private-data, untrusted-input, outbound path in this server alone: no tool is tagged private-data or untrusted-input.
- Reads private data0
- Reads files, mail, messages, databases, secrets, calendars or repositories.
- Reads text others write0
- Brings in text someone else can write: web pages, inbound email, messages, issues and comments.
- Can send data out4
- Can carry data to people or systems: it sends, posts or publishes, or takes a recipient, channel or URL.
Other servers in the same agent add their own tools to these paths. Audit your whole setup to see them together.
Remote posture
What anyone on the internet sees at the remote endpoint: an anonymous initialize and tools/list, and the public OAuth metadata.
Looked at Nov 20, 2026, 19:20 UTC, unchanged since Oct 29, 2026. No credentials were sent and no tool was called. What is looked at.
- Reachable
- yes
- HTTP status of an anonymous initialize
- 200
- tools/list served without credentials
- yes
- Tools that change things, listed without credentials
- 12
- Protocol version
- 2025-06-18
- WWW-Authenticate on 401
- not observed
- resource_metadata in WWW-Authenticate
- not observed
- RFC 9728 protected resource metadata
- not observed
- Authorization servers
- not observed
- Legacy HTTP+SSE transport
- no
- Dynamic client registration
- not observed
- Client ID metadata documents
- not observed
- HighThe whole server
The endpoint served tools/list without credentials, and the list has 12 tools that change things (4 irreversible, 8 write). Whether a call also works without credentials was not tested: tools are never called.
What this check looks forMatched text
https://transitradar.co.uk/mcp: tools/list returned 16 tools to an anonymous client, including plan_journey (irreversible), bus_stop_departures (irreversible), station_departures (irreversible), plan_door_to_door (irreversible), bus_performance (write) and 7 more
Posture changes
- Oct 29, 2026
- Tools that change things, listed without credentials: 11 to 12
Findings
Matches of fixed checks, with the text they matched.
- Warnplan_journey
The server marks "plan_journey" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
The server marks "bus_stop_departures" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The name "bus_stop_departures" says "stop": a word for a change.
The server marks "station_departures" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
The server marks "plan_door_to_door" read-only (readOnlyHint: true), and its own name, description or input give the class "irreversible".
What this check looks forMatched text
annotations: {"readOnlyHint":true,"destructiveHint":false}; The input addresses people (input.to): what it sends cannot be taken back.
History
Changes to its tool definitions and to its remote endpoint, newest first.
Tools1 changed.~1 changedView diff
- Changed:plan_journeyCan't be undonedescriptioninputSchema
PostureRemote posture changed. Tools that change things, listed without credentials: 11 -> 12.View diff
- Tools that change things, listed without credentials: 11 to 12
Tools1 added.+1 addedView diff
- Added:late_trainsChanges things
Install
Pinned to version 1.5.0. Values in angle brackets are yours to fill in.
claude mcp add --transport http transitradar https://transitradar.co.uk/mcpclaude mcp add --transport http transitradar https://transitradar.co.uk/mcpRun in a terminal.
Claude Code permissions
Allow the reads, ask before a change or a way out, deny the deletes. Paste into .claude/settings.json.
{
"permissions": {
"allow": [
"mcp__transitradar__get_train",
"mcp__transitradar__find_train",
"mcp__transitradar__find_unit",
"mcp__transitradar__search_stations"
],
"ask": [
"mcp__transitradar__plan_journey",
"mcp__transitradar__bus_performance",
"mcp__transitradar__late_trains",
"mcp__transitradar__disruptions",
"mcp__transitradar__train_history",
"mcp__transitradar__bus_stop_departures",
"mcp__transitradar__station_info",
"mcp__transitradar__station_departures",
"mcp__transitradar__daily_performance",
"mcp__transitradar__bus_disruptions",
"mcp__transitradar__plan_door_to_door",
"mcp__transitradar__direct_destinations"
],
"deny": []
}
}Tools that only read are allowed, tools that change things ask first, tools that delete or cancel are denied. A read that can send data out (it takes a URL, say) asks first too. It assumes the server is installed as transitradar. Review it before you use it.
Capability tags behind 4 rules
- mcp__transitradar__plan_journey outbound
- mcp__transitradar__bus_stop_departures outbound
- mcp__transitradar__station_departures outbound
- mcp__transitradar__plan_door_to_door outbound
Pin
Keep the decision: fail CI when the tools change, follow every change, or show a badge.
Pin in CI
Fail a build when the tools you reviewed are not the tools the server serves today.
curl -s "https://radar.anlyon.com/api/v1/servers/uk.co.transitradar/transitradar/verify?hash=62d74f04e463152ecbc6f557b1bac047d07597ea459a4ad759b076ee76f7206a" | jq -e '.changed == false'Pinned hash 62d74f04e463, from Nov 21, 2026, 18:18 UTC.
Watch
Get told when its tools change: a new tool, a new description, a new class.
https://radar.anlyon.com/servers/uk.co.transitradar/transitradar/changes.xmlAn Atom feed. Works in any feed reader or Slack's RSS app.
Badge
[](https://radar.anlyon.com/servers/uk.co.transitradar/transitradar)Source: MCP Registry. Synced Nov 21, 2026, 18:18 UTC.
TransitRadar — UK trains and buses MCP server: questions and answers
Answered from the scan above, not from the publisher's description.
Is the TransitRadar — UK trains and buses MCP server safe?
- No scan can promise that. What its definitions show: 16 tools, 12 of which can change, send or delete something, and 4 findings from fixed checks. Allow the reads, ask before each change, and deny the deletes; the permissions block on this page does that.
Can the TransitRadar — UK trains and buses MCP server delete data?
- No tool is classed as destructive: going by their definitions, none of them deletes, cancels or revokes anything.
Can the TransitRadar — UK trains and buses MCP server do things that cannot be undone?
- Yes. 4 tools can send, pay, publish or merge: plan_journey, bus_stop_departures, station_departures and plan_door_to_door.
What tools does the TransitRadar — UK trains and buses MCP server have?
- 16 tools: 4 irreversible, 8 write, 4 read. plan_journey, bus_stop_departures, station_departures, plan_door_to_door, bus_performance, late_trains, disruptions, train_history and 8 more.
Does the TransitRadar — UK trains and buses MCP server need sign-in or OAuth?
- Its remote endpoint listed its tools to an anonymous client, without sign-in.
Does the TransitRadar — UK trains and buses MCP server send data to outside services?
- 4 tools can carry data out (it sends, posts or publishes, or takes a recipient, channel or URL): plan_journey, bus_stop_departures, station_departures and plan_door_to_door.
Has the TransitRadar — UK trains and buses MCP server changed its tools?
- Yes, 2 times since Anlyon Radar started tracking it, most recently on Nov 21, 2026. Every change is on this page and in its Atom feed.